3m x 3m Extension in Cirencester

Project Overview

This project comprised a new build 3m x 3m modular extension complete with prominent UPVC glazing with a clean white thincoat silicon render to match the frames and complement the natural Cotswold stone house.

Our scope of works included preparation of existing ground, excavation and fill of concrete strip foundations, erection of our bespoke modular steel frame with insulated wall panels, new electrical, decoration and flooring installations.

The build was complete within 14 working days from start to finish and to the agreed fixed contract price.

Scroll down below for the clients video testimonial.

USE:
Living Space
size:
3m x 3m = 9 SQ/M
FINISH:
Thincoat Render
PROJECT VALUE:
£27,000
DURATION:
14 Days
location:
Cirencester

HOW WE DID IT?

This project comprised a new build 3m x 3m modular extension complete with prominent UPVC glazing with a clean white thincoat silicon render to match the frames and complement the natural Cotswold stone house.

Our scope of works included preparation of existing ground, excavation and fill of concrete strip foundations, erection of our bespoke modular steel frame with insulated wall panels, new electrical, decoration and flooring installations.

The build was complete within 14 working days from start to finish and to the agreed fixed contract price.

Scroll down below for the clients video testimonial and some more gallery images.

Thincoat Silicon Render

Concrete Strip Foundations

Prominant Glazing

Our scope of works involved:

  • Installation of concrete strip foundations
  • Thincoat silicon render
  • Flat EPDM roof
  • White painted internal walls and ceilings
  • Electrics & lighting
  • High quality LVT flooring
  • Opening to existing house
  • Flashing and detailing to existing stone house

By far this has been the best experience we have had with any work we have ever had done to any house we have lived in. The innovation is great, the way the back office team have dealt with us was kind and professional, and the way the onsite team have worked has been exceptional. What a lovely team. The results have changed the way we use the house in a very positive way. Thank you to everyone

Derek McLean
Watch the video testimonial with the client:
No items found.

benefits

Our modular buildings are designed, engineered and built to perfection

10 Year Warranty

We’re so confident in the longevity and performance of our structural steel frame modular buildings that we offer an industry-leading 10 year guarantee as standard.

Lead time

We are proud to offer an industry-leading guaranteed 6 week lead time from the date of order.

Bespoke

Our distinctive range of exterior cladding finishes and architectural embellishments is quite simply unparalleled. There are no limits to the space we can create for you.

One Price; No Hidden Extras

Our price includes everything from delivery, installation, foundations, doors & windows, painted walls, electrics, lighting and flooring, to name just a few.

Built to UK Building Regulations

Our modular buildings comply with all aspects of current UK building regulations, so you not only have complete peace of mind that your extension is built to last but you also have a space that can be comfortably used all year round.

Designed & Built in the UK

We use the most advanced modular construction technology to precision craft every modular building at our Warwickshire production facility.

How our Design & Build Process Works

Step 1
ENQUIRY
Complete our customer enquiry form so we can fully understand your modular building requirements, and one of our dedicated team members will contact you to arrange a design consultation. Please contact us to arrange a visit to our Garden Room showroom in Coventry.
Step 2
PROPOSAL
We will send over a proposal that includes our terms and conditions, technical drawings, agreed payment plan details, and offer you a fixed installation date commitment for your modular building.
Step 3
SITE SURVEY
One of our expert project managers will take a few measurements at a pre-arranged site survey and make all considerations to ensure the installation process will go as smoothly as possible.
Step 4
MANUFACTURE
Our team will begin the manufacturing process at our Warwickshire production facility to precision craft your modular building and book in our installation team for the agreed installation date.
Step 5
INSTALLATION
We will contact you around a week before the agreed installation date to confirm any final arrangements that need to be made. Our install team will arrive on the morning of your install date and complete all works within the agreed timeframe. Our standard garden rooms are typically installed within 5-7 working days for example.
GET A QUOTE
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Close